Logo: Relish

  1. Sign in

Project: Borrow-manage-1

Availability of Models

As an Inventory Manager
I want to know when things are available
In order to make sure that reservations can be met

Background As a Organisation we have some Inventory with things to lend out
Given
inventory pool 'ABC'
And
a lending_manager for inventory pool 'ABC' is logged in as 'lending_manager'
Scenarios
  • @rack
No reservations
Given
7 items of model 'NEC 245' exist
And
0 reservations exist for model 'NEC 245'
When
lending_manager checks availability for 'NEC 245'
Then
it should always be available
  • @rack
With reservation
Given
7 items of model 'NEC 245' exist
And
a reservation exists for 3 'NEC 245' from 21.3.2030 to 31.3.2030
When
lending_manager checks availability for 'NEC 245'
Then
7 should be available from now to 20.3.2030
And
4 should be available from 21.3.2030 to 31.3.2030
And
7 should be available from 1.4.2030 to the_end_of_time
  • @rack
With mulitple reservations
Given
7 items of model 'NEC 245' exist
And
a reservation exists for 3 'NEC 245' from 21.3.2030 to 31.3.2030
And
a reservation exists for 2 'NEC 245' from 10.3.2030 to 24.3.2030
And
a reservation exists for 2 'NEC 245' from 23.3.2030 to 5.4.2030
When
lending_manager checks availability for 'NEC 245'
Then
7 should be available from now to 9.3.2030
And
5 should be available from 10.3.2030 to 20.3.2030
And
2 should be available from 21.3.2030 to 22.3.2030
And
0 should be available from 23.3.2030 to 24.3.2030
And
2 should be available from 25.3.2030 to 31.3.2030
And
5 should be available from 1.4.2030 to 5.4.2030
And
7 should be available from 6.4.2030 to the_end_of_time
  • @rack
With mulitple one day reservations of a model having one single item
Given
1 items of model 'NEC 245' exist
And
a reservation exists for 1 'NEC 245' from 21.3.2030 to 21.3.2030
When
lending_manager checks availability for 'NEC 245'
Then
0 should be available from 21.3.2030 to 21.3.2030
  • @rack
With mulitple one day reservations of a model having two items
Given
2 items of model 'NEC 245' exist
And
a reservation exists for 2 'NEC 245' from 21.3.2030 to 21.3.2030
When
lending_manager checks availability for 'NEC 245'
Then
0 should be available from 21.3.2030 to 21.3.2030
  • @rack
With Maintenance Day
Given
a model 'NEC 245' exists
And
the maintenance period for this model is 4 days
And
7 items of that model exist
And
a reservation exists for 3 'NEC 245' from 21.3.2030 to 31.3.2030
And
a reservation exists for 2 'NEC 245' from 10.3.2030 to 24.3.2030
When
lending_manager checks availability for 'NEC 245'
Then
7 should be available from now to 9.3.2030
And
5 should be available from 10.3.2030 to 20.3.2030
And
2 should be available from 21.3.2030 to 28.3.2030
And
4 should be available from 29.3.2030 to 4.4.2030
And
7 should be available from 5.4.2030 to the_end_of_time
  • @rack
Maximum availabliltiy
Given
a model 'NEC 245' exists
And
the maintenance period for this model is 4 days
And
7 items of that model exist
And
a reservation exists for 3 'NEC 245' from 21.3.2030 to 31.3.2030
When
lending_manager checks availability for 'NEC 245'
Then
the maximum available quantity on 20.3.2030 is 7
And
the maximum available quantity on 21.3.2030 is 4
And
the maximum available quantity on 31.3.2030 is 4
And
the maximum available quantity on 4.4.2030 is 4
And
the maximum available quantity on 5.4.2030 is 7
  • @rack
In Repair
Given
7 items of model 'NEC 245' exist
And
a reservation exists for 3 'NEC 245' from 21.3.2030 to 31.3.2030
And
lending_manager marks 1 'NEC 245' as 'in-repair' on 18.3.2030
When
lending_manager checks availability for 'NEC 245'
Then
the maximum available quantity on 20.3.2030 is 6
And
the maximum available quantity on 21.3.2030 is 3
  • @rack
Not Returned
Given
1 items of model 'Lasersword Grendab' exist
And
a contract exists for 1 'Lasersword Grendab' from 1.1.2030 to 5.1.2030
When
lending_manager checks availability for 'Lasersword Grendab'
Then
if I check the maximum available quantity for 8.1.2030 it is 1 on 4.1.2030
Then
if I check the maximum available quantity for 8.1.2030 it is 1 on 6.1.2030
Given
the lending_manager signs the contract
When
lending_manager checks availability for 'Lasersword Grendab'
Then
if I check the maximum available quantity for 8.1.2030 it is 1 on 4.1.2030
Then
if I check the maximum available quantity for 8.1.2030 it is 0 on 6.1.2030
  • @rack
Reservations from the past
Given
3 items of model 'Lasersword Grendab' exist
And
the maintenance period for this model is 2 days
And
a reservation exists for 1 'Lasersword Grendab' from 1.1.1999 to 5.10.2030
When
lending_manager checks availability for 'Lasersword Grendab' on 6.1.2030
Then
the maximum available quantity on 8.1.2030 is 2
And
the maximum available quantity on 15.2.2222 is 3
  • @rack
Availability for a period of time
Given
3 items of model 'Lasersword Grendab' exist
And
a reservation exists for 1 'Lasersword Grendab' from 17.1.2030 to 27.2.2030
When
lending_manager checks availability for 'Lasersword Grendab'
Then
the maximum available quantity from 16.1.2030 to 28.2.2030 is 2
And
the maximum available quantity from 10.1.2030 to 16.1.2030 is 3
And
the maximum available quantity from 10.1.2030 to 17.1.2030 is 2
And
the maximum available quantity from 19.1.2030 to 22.1.2030 is 2
And
the maximum available quantity from 22.2.2030 to 1.3.2030 is 2
And
the maximum available quantity from 27.2.2030 to 1.3.2030 is 2
And
the maximum available quantity from 28.2.2030 to 5.4.2030 is 3
  • @rack
Availability for a period - complicated
Given
3 items of model 'Lasersword Grendab' exist
And
a reservation exists for 1 'Lasersword Grendab' from 17.1.2030 to 27.2.2030
And
a reservation exists for 1 'Lasersword Grendab' from 20.1.2030 to 5.2.2030
And
a reservation exists for 1 'Lasersword Grendab' from 1.2.2030 to 9.3.2030
When
lending_manager checks availability for 'Lasersword Grendab'
Then
the maximum available quantity from 10.1.2030 to 16.1.2030 is 3
And
the maximum available quantity from 17.1.2030 to 28.2.2030 is 0
And
the maximum available quantity from 17.1.2030 to 31.1.2030 is 1
And
the maximum available quantity from 1.2.2030 to 5.2.2030 is 0
And
the maximum available quantity from 6.2.2030 to 15.3.2030 is 1
And
the maximum available quantity from 28.2.2030 to 31.3.2030 is 2
And
the maximum available quantity from 6.1.2030 to 1.2.2030 is 0
  • @rack
A reservation of a single day should be blocking
Given
reported by HKB on 1.June 2010 as #225
Given
1 item of model 'RepRap' exist
And
a reservation exists for 1 'RepRap' from 17.1.2030 to 17.1.2030
When
lending_manager checks availability for 'RepRap'
Then
the maximum available quantity from 15.1.2030 to 20.1.2030 is 0
And
the maximum available quantity from 15.1.2030 to 16.1.2030 is 1
And
the maximum available quantity from 16.1.2030 to 17.1.2030 is 0
And
the maximum available quantity from 17.1.2030 to 17.1.2030 is 0
And
the maximum available quantity from 17.1.2030 to 18.1.2030 is 0
And
the maximum available quantity from 18.1.2030 to 20.1.2030 is 1